Weekly Wrap Up: Whitemarsh Kitchen

Whitemarsh kitchen

We are working this week on the final touches for this wonderful, modest-sized Lafayette Hill kitchen. What began as a fairly cramped space is now more comfortably sized, thanks to the removal of a non-load-bearing wall between the kitchen and dining room.

Last “to do” items for this project include:

  • Grout the honed Carrara subway tile
  • Electrical trim out
  • Install the micro hood
  • Install the knobs
  • Final coat the all-new oak floor

To keep their budget in check, the homeowners decided to handle the painting themselves. And since their appliances were fairly new, we were able to reuse everything but the garbage disposal. Cost-cutting measures such as these equate to a project that is within reach for most folks!